Bengaluru Authority orders water board to fill lakes, fix sewage leaks
Greater Bengaluru Authority directs water board to fill lakes, shifts 103 bus-stands to reduce traffic congestion and improve city infrastructure.
The Greater Bengaluru Authority has ordered the Bangalore Water Supply and Sewerage Board to coordinate with city corporations to fill lakes under Cauvery Stage V and through sewage treatment plants.
GBA chief M. Maheswar Rao announced the directive after the third meeting of the GBA executive committee held on Thursday. The water board was also instructed to focus on limiting leakages and coordinating with city corporations while implementing its annual action plan.
Rainwater harvesting systems under scrutiny
The BWSSB has been directed to take up a special drive to identify irregularities after noting that rainwater harvesting systems were failing in some cases, resulting in water entering the sewerage network.
Fire safety and transport overhaul
The Fire and Emergency Services submitted a list of 55 locations in the city where a fire hydrant network could be installed. Greater Bengaluru Development Minister Krishna Byre Gowda, who chaired the executive committee meeting, also directed the department to review the need for foam-based fire tenders.
The Minister ordered the shifting of 103 bus-stands in the city to eliminate traffic chokepoints. He also asked BMTC and other department officials to come up with an action plan to improve first- and last-mile connectivity to promote public transport.
Infrastructure and civic monitoring
Byre Gowda ordered the completion of the walkway at Iblur Junction on the Outer Ring Road, one of the city's most congested junctions. The corporations have been told to expedite the Suraksha 75 project taken up to curb accidents in the city.
Rao said that CCTV cameras installed under the Safe City project could be used for civic work purposes, such as identifying potholes or garbage littering.
Source: The Hindu
Frequently asked questions
What has the Greater Bengaluru Authority ordered the water board to do?
The Greater Bengaluru Authority has ordered the Bangalore Water Supply and Sewerage Board to fill lakes under Cauvery Stage V and through sewage treatment plants, limit leakages, and coordinate with city corporations while implementing its annual action plan.
Why is the water board investigating rainwater harvesting systems?
The BWSSB is taking up a special drive to identify irregularities in rainwater harvesting systems after noting that some were failing, resulting in water entering the sewerage network.
How many bus-stands will be shifted in Bengaluru?
The Minister has ordered the shifting of 103 bus-stands in the city to eliminate traffic chokepoints and improve first- and last-mile connectivity to promote public transport.
What infrastructure projects are being prioritized in the city?
Priority projects include completing the walkway at Iblur Junction on the Outer Ring Road and expediting the Suraksha 75 project to curb accidents. Additionally, 55 locations have been identified for fire hydrant network installation.
Most read
- 1
Tesla audits Chinese suppliers to scale up Optimus robot production
- 2
Former minister Lakhan Singh Rajput to inaugurate temple bhandara at Shri Chakreshwar Mahadev
- 3
Firozabad BSA finds four government schools locked during inspection
- 4
Tamil Nadu dengue cases fall for third consecutive year to 17,049
- 5
Social workers stage silent protest at Fufund railway station for train halts
Comments
No comments yet. Be the first to comment.