Guntur railway station subway closed until June 30 for repairs
Guntur railway station subway closed till June 30 for seepage works. Passengers advised to use foot over-bridges during this period.
Guntur: The pedestrian subway at Guntur railway station will be temporarily closed from Friday, June 19, to June 30 to facilitate essential engineering works aimed at addressing water seepage caused by excessive groundwater ingress, the South Coast Railway's (SCR) Guntur Division announced on Thursday.
The closure will allow the expansion of the existing sump and the execution of related infrastructure works to improve drainage and prevent water accumulation in the subway, particularly during the monsoon season. These upgrades are part of the Railways' broader initiative to enhance passenger safety and ensure uninterrupted usability of the facility.
Railway officials explained that increasing the sump's capacity would enable more effective collection and pumping of seepage water, thereby reducing inconvenience to passengers. During the closure, passengers are advised to use the station's foot over-bridges and other designated crossing facilities. The Guntur Division assured that adequate signage and public announcements would be in place to guide passengers and minimise disruptions.
The SCR has expressed regret for the temporary inconvenience and has sought passengers' cooperation during the improvement works, which are being undertaken to enhance safety, accessibility, and comfort. The announcement was made by D. Vinay Kanth, Divisional Commercial Manager, Guntur Division, SCR.
Most read
- 1
Raja Mahendra Pratap Singh University launches 'Free Thinkers Club' for students
- 2
Andhra Pradesh Cabinet Ministers List 2026 with Contact Numbers and Portfolios
- 3
Teacher arrives drunk at Firozabad school, sparks chaos and protests
- 4
Hamirpur stenographer rescued after suicide attempt from bridge
- 5
Tamil Nadu Cabinet Ministers List 2026 with Portfolios
Comments
No comments yet. Be the first to comment.