Guntur railway station subway closed until June 30 for repairs
Guntur railway station subway closed till June 30 for seepage works. Passengers advised to use foot over-bridges during this period.
Guntur: The pedestrian subway at Guntur railway station will be temporarily closed from Friday, June 19, to June 30 to facilitate essential engineering works aimed at addressing water seepage caused by excessive groundwater ingress, the South Coast Railway's (SCR) Guntur Division announced on Thursday.
The closure will allow the expansion of the existing sump and the execution of related infrastructure works to improve drainage and prevent water accumulation in the subway, particularly during the monsoon season. These upgrades are part of the Railways' broader initiative to enhance passenger safety and ensure uninterrupted usability of the facility.
Railway officials explained that increasing the sump's capacity would enable more effective collection and pumping of seepage water, thereby reducing inconvenience to passengers. During the closure, passengers are advised to use the station's foot over-bridges and other designated crossing facilities. The Guntur Division assured that adequate signage and public announcements would be in place to guide passengers and minimise disruptions.
The SCR has expressed regret for the temporary inconvenience and has sought passengers' cooperation during the improvement works, which are being undertaken to enhance safety, accessibility, and comfort. The announcement was made by D. Vinay Kanth, Divisional Commercial Manager, Guntur Division, SCR.
Frequently asked questions
Why is the Guntur railway station subway being closed?
The subway is being closed to facilitate essential engineering works aimed at addressing water seepage caused by excessive groundwater ingress. The works include expanding the existing sump and improving drainage to prevent water accumulation, particularly during the monsoon season.
When will the Guntur railway station subway be closed?
The pedestrian subway will be temporarily closed from Friday, June 19, to June 30.
What alternative routes are available for passengers during the subway closure?
During the closure, passengers are advised to use the station's foot over-bridges and other designated crossing facilities.
How will the railway station inform passengers about the closure?
Adequate signage and public announcements will be in place to guide passengers and minimise disruptions during the improvement works.
Most read
- 1
Air China Adds Extra Flight for Passengers Stranded in Fuel-Starved Cuba
- 2
Western disturbance to bring rain, hail and strong winds across north India
- 3
Yogi Adityanath Directs No Occupied Houses Be Demolished for Achhalda Bridge
- 4
Gwalior Temple Truck Crash Kills 12, Injures 28-29 Devotees During Navratri
- 5
Schools Shut in Five Tamil Nadu Districts, Including Chennai, Amid Heavy Rain
Comments
No comments yet. Be the first to comment.